17 KiB
Executable file
Debian Forge TODO: Building Debian Atomic System
Project Goal
Build a complete Debian atomic build system that combines OSBuild architecture, debos logic, and Koji-like orchestration to create Debian atomic images with bootc containers.
Phase 1: Foundation and Analysis (Weeks 1-6)
Week 1-2: Project Setup
-
Set up development environment
- Configure Debian-based development machine
- Install required dependencies (Go, Python, OSTree, etc.)
- Set up version control and branching strategy
- Create development documentation
-
Fork OSBuild repository
- Verify all OSBuild components are present
- Identify Fedora/RPM-specific components to replace
- Document current OSBuild architecture
-
Download and analyze debos source code
- Map debos actions to OSBuild stages
- Identify Debian package management logic to integrate
- Document debos OSTree integration points
-
Set up basic project structure
- Create integration layer between OSBuild and debos
- Set up build environment for testing
- Create initial project documentation
Week 3-4: Code Analysis
-
Analyze OSBuild architecture
- Map OSBuild pipeline components (stages, devices, mounts, inputs)
- Identify RPM-specific components to replace
- Document OSBuild's build environment management
- Analyze OSBuild's object store and caching
-
Map debos functionality to OSBuild components
- Create mapping table: debos actions → OSBuild stages
- Identify debos package management logic
- Document debos filesystem operations
- Analyze debos OSTree integration
-
Identify integration points
- Define interfaces between OSBuild and debos
- Plan Koji-like orchestration integration
- Document data flow between components
- Identify shared data structures
-
Document current architecture
- Create architecture diagrams
- Document component relationships
- Identify modification points
- Create integration specifications
Week 5-6: Planning and Design
-
Design Debian-specific component architecture
- Design Debian package management layer
- Plan OSTree composition for Debian packages
- Design build environment management
- Create component interface specifications
-
Plan Koji-like orchestration system
- Design build scheduling system
- Plan build queue management
- Design resource allocation
- Plan build monitoring and logging
-
Define interfaces between components
- Define API contracts
- Design data exchange formats
- Plan error handling and recovery
- Define configuration management
-
Create detailed technical specifications
- Write component specifications
- Define data flow specifications
- Create API documentation
- Write integration test specifications
Deliverables: Project structure, architecture documentation, technical specifications
Phase 2: Core OSBuild Modification (Weeks 7-18)
Week 7-10: Package Management Layer
-
Replace RPM package management with Debian package management
- Create Debian package input source
- Implement Debian repository handling
- Replace RPM-specific stages with Debian equivalents
- Test basic package operations
- Add mmdebstrap as default alternative to debootstrap
-
Integrate debos package handling logic
- Extract debos package management code
- Create OSBuild stages for debos actions
- Integrate debos package installation logic
- Test package dependency resolution
-
Implement Debian repository handling
- Create Debian repository source
- Implement package metadata parsing
- Add repository authentication support
- Test repository operations
-
Test basic package operations
- Test package download
- Test package installation
- Test dependency resolution
- Test package removal
Week 11-14: Build Environment Integration
-
Replace Mock integration with sbuild/pbuilder integration
- Create sbuild build environment stage
- Implement pbuilder integration
- Replace Mock-specific components
- Test build environment creation
-
Implement Debian build environment setup
- Create Debian chroot setup
- Implement build dependency installation
- Add build environment customization
- Test environment isolation
-
Test build environment creation and management
- Test chroot creation
- Test package building in environments
- Test environment cleanup
- Test environment reuse
-
Validate package building in Debian environments
- Test simple package builds
- Test complex dependency chains
- Test build failures and recovery
- Test build environment persistence
Week 15-18: OSTree Composition
-
Adapt OSTree composition for Debian packages
- Create Debian OSTree composition stage
- Implement package-to-OSTree conversion
- Add Debian-specific metadata handling
- Test basic OSTree composition
-
Test OSTree commit creation from Debian packages
- Test single package commits
- Test multi-package commits
- Test commit metadata
- Test commit verification
-
Validate filesystem composition
- Test filesystem structure
- Test file permissions and ownership
- Test symbolic links and hard links
- Test filesystem integrity
-
Test basic atomic functionality
- Test atomic updates
- Test rollback capability
- Test atomic rebasing
- Test atomic deployment
Deliverables: Modified OSBuild with Debian package support, working OSTree composition
Phase 3: Build Orchestration (Weeks 19-30)
Week 19-22: Basic Orchestration
-
Implement build scheduling system
- Create build queue management
- Implement priority-based scheduling
- Add resource allocation logic
- Test scheduling algorithms
-
Add build queue management
- Implement build submission
- Add build status tracking
- Implement queue prioritization
- Test queue operations
-
Implement basic resource allocation
- Add CPU allocation
- Add memory allocation
- Add storage allocation
- Test resource management
-
Test build submission and tracking
- Test build submission
- Test build status updates
- Test build cancellation
- Test build prioritization
Week 23-26: OSBuild Integration
- Integrate modified OSBuild with orchestration system
- Connect OSBuild pipeline to orchestration
- Implement build submission interface
- Add build result handling
- Test osbuild-composer integration
- Test composer APIs with Debian stages
- Validate blueprint system for Debian atomic images
- Test composer orchestration with our build system
Week 23-26: Build Management
-
Add build status tracking
- Implement build state machine
- Add status persistence
- Implement status notifications
- Test status tracking
-
Implement build logging and monitoring
- Add build log collection
- Implement log streaming
- Add build metrics collection
- Test logging system
-
Add build history and artifact management
- Implement build history storage
- Add artifact storage and retrieval
- Implement build cleanup policies
- Test artifact management
-
Test complete build lifecycle
- Test build submission to completion
- Test build failure handling
- Test build retry mechanisms
- Test build cleanup
Week 27-30: Environment Management
-
Implement isolated build environment management
- Create environment isolation
- Implement environment cleanup
- Add environment reuse policies
- Test environment isolation
-
Add build host monitoring and health checks
- Implement host health monitoring
- Add resource usage tracking
- Implement health check failures
- Test monitoring system
-
Implement build environment cleanup
- Add automatic cleanup policies
- Implement cleanup scheduling
- Add cleanup verification
- Test cleanup operations
-
Test environment isolation and management
- Test environment isolation
- Test resource cleanup
- Test environment reuse
- Test failure recovery
Deliverables: Working build orchestration system, build environment management
Phase 4: Integration and Testing (Weeks 31-42)
Week 31-34: System Integration
-
Integrate modified OSBuild with orchestration system
- Connect OSBuild pipeline to orchestration
- Implement build submission interface
- Add build result handling
- Test complete integration
-
Test complete build pipeline from submission to completion
- Test end-to-end build process
- Test build pipeline stages
- Test build result generation
- Test build artifact storage
-
Validate multi-stage build workflows
- Test complex build workflows
- Test workflow dependencies
- Test workflow failures
- Test workflow recovery
-
Test error handling and recovery
- Test build failures
- Test system failures
- Test recovery mechanisms
- Test error reporting
Week 35-38: Output Generation
-
Test image generation (ISO, QCOW2, RAW)
- Test ISO generation
- Test QCOW2 generation
- Test RAW image generation
- Validate image formats
-
Validate bootc container creation
- Test container creation
- Test container metadata
- Test container verification
- Test container deployment
-
Test multi-format output generation
- Test simultaneous format generation
- Test format-specific optimizations
- Test format validation
- Test format distribution
-
Validate image bootability
- Test image boot process
- Test kernel loading
- Test filesystem mounting
- Test system initialization
Week 39-42: Performance and Stability
-
Performance testing and optimization
- Test build performance
- Identify bottlenecks
- Implement optimizations
- Validate performance improvements
-
Stress testing with multiple concurrent builds
- Test concurrent build limits
- Test resource contention
- Test system stability under load
- Test failure scenarios
-
Bug fixing and stability improvements
- Fix identified bugs
- Improve error handling
- Add stability improvements
- Test stability fixes
-
Documentation updates
- Update technical documentation
- Create user documentation
- Create deployment documentation
- Create troubleshooting guides
Deliverables: Integrated system, working image generation, performance optimization
Phase 5: Web Interface and Production Features (Weeks 43-54)
Week 43-46: Basic Web UI
-
Implement basic web interface for build management
- Create build submission forms
- Add build status display
- Implement build history view
- Test web interface functionality
-
Add build status monitoring
- Implement real-time status updates
- Add build progress indicators
- Implement status notifications
- Test monitoring features
-
Implement build submission forms
- Create build configuration forms
- Add validation and error handling
- Implement form submission
- Test form functionality
-
Test web interface functionality
- Test form submission
- Test status updates
- Test error handling
- Test user experience
Week 47-50: Advanced Web Features
-
Add build history and search
- Implement build history storage
- Add search and filtering
- Implement pagination
- Test search functionality
-
Implement user management and permissions
- Add user authentication
- Implement role-based access control
- Add user management interface
- Test permission system
-
Add system administration interface
- Create system configuration interface
- Add monitoring and health checks
- Implement system maintenance tools
- Test admin interface
-
Test complete web interface
- Test all web features
- Test user workflows
- Test admin workflows
- Test security features
Week 51-54: Production Readiness
-
Security testing and hardening
- Conduct security audit
- Implement security improvements
- Add security monitoring
- Test security features
-
Performance optimization for production loads
- Optimize for production workloads
- Test production load scenarios
- Implement performance monitoring
- Validate production performance
-
Documentation completion
- Complete technical documentation
- Complete user documentation
- Complete deployment documentation
- Create maintenance guides
-
Deployment preparation
- Create deployment scripts
- Prepare production environment
- Create backup and recovery procedures
- Test deployment process
Deliverables: Web interface, production-ready system, complete documentation
Critical Path Items (Must Complete First)
Phase 1 Critical Path
- OSBuild Architecture Analysis - Must understand current system before modifying
- debos Integration Planning - Must plan how to integrate Debian logic
- Technical Specifications - Must have clear plan before implementation
Phase 2 Critical Path
- Debian Package Management - Core functionality required for everything else
- OSTree Composition - Essential for atomic functionality
- Build Environment Integration - Required for package building
Phase 3 Critical Path
- Build Orchestration - Required for managing multiple builds
- Environment Management - Required for build isolation and resource management
Phase 4 Critical Path
- System Integration - Must connect all components
- Image Generation - Core output functionality
- Performance Optimization - Required for production use
Phase 5 Critical Path
- Web Interface - Required for user interaction
- Security Hardening - Required for production deployment
- Documentation - Required for adoption and maintenance
Risk Mitigation
Technical Risks
- OSBuild Complexity: Start with simple modifications, build complexity gradually
- Integration Challenges: Use well-defined interfaces, test integration points early
- Performance Issues: Test performance early, optimize continuously
- Compatibility Issues: Test with real Debian packages, validate edge cases
Timeline Risks
- Scope Creep: Stick to core functionality, defer advanced features
- Integration Delays: Plan integration carefully, test early and often
- Testing Complexity: Start testing early, automate testing where possible
- Documentation: Document as you go, don't leave it until the end
Resource Risks
- Developer Availability: Plan for developer rotation, document everything
- Infrastructure Issues: Use simple infrastructure initially, scale gradually
- Dependency Changes: Monitor upstream projects, plan for changes
Success Metrics
Phase 1 Success
- Complete project setup and analysis
- Clear understanding of integration requirements
- Detailed technical specifications
Phase 2 Success
- Modified OSBuild with Debian package support
- Working OSTree composition for Debian packages
- Basic atomic functionality validation
Phase 3 Success
- Working build orchestration system
- Build environment management
- Complete build lifecycle support
Phase 4 Success
- Integrated system with working build pipeline
- Image generation and bootc container creation
- Performance and stability validation
Phase 5 Success
- Production-ready system with web interface
- Complete documentation and deployment guide
- Community adoption and feedback
Next Immediate Actions (This Week)
- Test the new Debian stages - Run the test manifest to validate functionality
- Set up build environment for testing - Configure testing infrastructure
- Begin OSTree integration testing - Test OSTree commit creation
- Plan Koji integration - Design build orchestration system
Notes
- Priority: Focus on core functionality first, add advanced features later
- Testing: Test each component individually before integration
- Documentation: Document everything as you go, don't assume you'll remember
- Iteration: Use iterative development, get working system early and improve gradually
- Community: Engage with Debian community early for feedback and adoption